Belaruskaliy
Friday, September 21, 2012
Sunday, September 2, 2012
Mechanized roof supports in Belaruskaliy
In the faces with the mean seams (complete and selective mining) the following types of the hydromechanized roof supports are used: BS2.1P, BS2.1PM, STS15/23L, STS16/24L, FAZOS -12/28-Oz, FAZOS -13/20-POz, FAZOS -16/24-POz.
Friday, August 24, 2012
Longwall shearers of Belaruskaliy
During compete mining we use double ended ranging drum shearers of the type "Electra700Sol", SL300, EDW300/760L, KGS800S/2BP, KGS 570S/2B/Sol and KS3M. During selective mining we use the shearers SL500S (together with the shearers for the end operations in the roadways ESA150L or KGU310/Sol), "Electra700Sel". During the layer mining the following shearer types are used: EW200/230LN, SL300NE, "Electra340Sol". |
Sunday, August 12, 2012
Dressing's methods in Belaruskaliy
Technology of the hot-leaching method consists of crushing the sylvinite ore, dissolving the sylvinite by the hot liquor in dissolving tanks with screw mixers and bucket elevators, cooling (in order to achieve crystallization of the potassium chloride from the clarified saturated solution) and thickening in settling basins. After that the thickened suspension will be sent to the centrifuges. Drying of the filtrated potassium chloride is made on the drying drums and fluidized bed furnaces.Potassium chloride content in the concentrate makes out 95-98% and in halite waste 2,5-3,0%, extraction makes out 86,5-87,5%.
from
Technologies of mining in Belaruskaliy
Starobin deposit of the potash salts is one of the world's biggest deposits (about 350 sq. km). It is located in the southern part of Minsk Region. According to its structure the deposit represents a flat sheet deposit (pitch angle is 1-30°), consisting of four potash levels - from number one to number four (from top downward). The distance between the potash levels makes out from 50-60 meters (between number one and number two) to 150-200 meters (between number two and three, as well as between numbers three and four).
The seams in the levels II and III (seams number two and three) are being mined. The potash seam in the level number I at mine No. 1 was started to mined since 2004. The potash level number four is considered to be a perspective one for the further developing. Besides this, over the boundaries of the mine fields of the existing mines significant reserves of potash salts are explored which are planned for mining by PA "Belaruskali" in perspective (Krasnoslobodski and Nezhinski areas of the deposit).
Chamber mining
By means of chamber system the mining of the deposit was started which prevents the dangerous deformations of the underworked rock mass and in consequence eliminates the penetration of underground water into the goaf.We use the following types of chamber mining in our deposit:
- Mining with establishing the yielding pillars
- Mining with establishing the support pillar
- Mining with regular establishing the yielding and support pillars.
Pillar mining
Pillar mining of the 2nd and 3rd potash seams by means of longwall mining (face mining) with roof caving is used since 1969.
We use the following types of longwall mining:
- Complete mining of the 2nd stratum and seams II, II-III and seam III of the 3rd stratum without seam separation.
- Selective mining of the seams II, II-III and seam III of the 3rd stratum without seam separation.
- Layer extraction of the 2nd seam.
- Layer extraction of the 3rd seam.
Combined system of mining
The seams in the levels II and III (seams number two and three) are being mined. The potash seam in the level number I at mine No. 1 was started to mined since 2004. The potash level number four is considered to be a perspective one for the further developing. Besides this, over the boundaries of the mine fields of the existing mines significant reserves of potash salts are explored which are planned for mining by PA "Belaruskali" in perspective (Krasnoslobodski and Nezhinski areas of the deposit).
By means of chamber system the mining of the deposit was started which prevents the dangerous deformations of the underworked rock mass and in consequence eliminates the penetration of underground water into the goaf.We use the following types of chamber mining in our deposit:
- Mining with establishing the yielding pillars
- Mining with establishing the support pillar
- Mining with regular establishing the yielding and support pillars.
Pillar mining of the 2nd and 3rd potash seams by means of longwall mining (face mining) with roof caving is used since 1969.
We use the following types of longwall mining:
- Complete mining of the 2nd stratum and seams II, II-III and seam III of the 3rd stratum without seam separation.
- Layer extraction of the 2nd seam.
- Layer extraction of the 3rd seam.
from
Friday, August 3, 2012
Potassium and health of Belaruskaliy
- Regulation of water balance and acid-alkali balance;
- Equation of the blood pressure and normalization of the myocardium rhythm;
- Maintenance of neuromuscular cells activity;
- Regulation of ferments activity, which are connected with the transformation of carbohydrates and proteins.
JSC "Belaruskali" sales and logistics department
The main goal of the Closed JSC BPC functioning is the maximum meeting of the demands of the potash mineral fertilizers users without the participation of intermediateries and keeping the market stability. Technical salt besides the above-mentioned countries goes into a number of East- and Western European countries. |
JSC "Belaruskali" sales and logistics department
Position | First name, last name | Office phone: +375 174 |
Director-general deputy on commercial issues and logistics | Vladimir Kobiashev | 22 53 25 |
Sales and logistics department head | Yelena Kudryavets | 29 86 08 |
Exports and logistics division head | Dmitri Prokhotski | 23 72 08 |
Deliveries to the domestic market and CIS countries division head | Natalya Steshits | 23 86 92 |
Subscribe to:
Posts (Atom)